A successful projects

In 2019, a KOS machine for printing customer test results, a printer for printing patient information wristbands, and a nurse call clock were successfully supplied and installed at the General Hospital of State Special Employees as part of the "Equipment Sale and Purchase" contract.
In the years 2018-2020, the Ministry of Health of the Kingdom of Belgium has successfully installed and delivered more than 100 types of equipment to the Regional Diagnostic and Treatment Center of Hovd Province within the framework of the project to empower the medical diagnosis of the western region and is responsible for the three-year maintenance during the warranty period. 

Triple oxygen plant system:

The first plant with a triple system in the Western region is 20 m33 /hour will produce 93-96% of oxygen, and a vacuum system with a capacity of 40 m3/hour was successfully installed and handed over along with a booster capable of charging 20 cylinders per day, and we are responsible for its operation and maintenance.

Previous
Next

Factory assembly, installation and operation training with portable containerized oxygen, vacuum and medical air triple system.

“Atlas Copco” company – Belgian Vant Uls, Antwerp, 2019

Engineer E. Nyambat, Engineer T. Ariunzaya